The modern railway installation of Period VI. Present-day version of the tower controlling the position of signals, points and track locks through electronic channels. It is gradually taking the place of mechanical signal towers. Clinker-built construction with the associated antenna masts ensuring the transmission of signals, and a decoration sheet.